Skip to content
(417) 625-4842

For carriers, tower operators & remote-site engineering

The site is three hours away. The battery should outlast the truck roll.

Every lead-acid string in a remote cabinet is a dispatch waiting to happen. A technician, a vehicle, a day, and a window where the site runs on nothing. Multiply that by your site count and the battery stops being a component and starts being a line item in your field-operations budget.

We build 48V lithium iron phosphate systems that drop into a 19-inch rack from 10Ah to 200Ah, report over RS485, and tell you where they are if somebody takes them.

Direct line to Joplin, Missouri — Monday–Friday, 8:00–5:00 Central. We also stock from Lancaster, Texas, inside the DFW metro.

Vision V-LFP 48V rack-mount lithium telecom battery module
10–200Ah
One 48V series
1U–5U
19-inch rack
1,200 m
RS485 reach

Sound familiar?

Nothing about remote-site power fails on a convenient day.

  • A cabinet in an outdoor enclosure cooks all summer, so the string that was rated for years quietly loses months every season.
  • You find out a battery is bad when the site drops, not when the battery goes bad.
  • Replacement means a scheduled truck, a certified technician, and a maintenance window on a site that has no redundancy.
  • Lead-acid takes shelf space and floor loading you would rather spend on radios.
  • Someone cut the fence and took the batteries, and you learned about it from an alarm three hops away.
  • Your monitoring platform sees the rectifier clearly and the battery barely at all.

How a site gets specified

Three conversations, then a part number.

We do not quote from a form. Remote-site power has too many local variables to guess at, and a wrong guess becomes a second truck roll.

  1. 01

    Tell us the site, not the SKU

    Rectifier make and float voltage, cabinet or shelter, free rack units, ambient temperature range, and the runtime your operations team actually requires. Fifteen minutes on a call covers it.

  2. 02

    We size it and show the math

    You get the model, the rack units it occupies, the weight your structure carries, and the discharge curve for that part number. If lead-acid is the better answer for the site, we will say so — we build both.

  3. 03

    Confirm lead time before you schedule

    We check what is on the floor in Missouri and Texas against what has to be built, and we give you the real date. Your construction schedule is not the place to find out.

What the hardware lets you do

Specifications matter because of what they remove from your week.

RS485, up to 1,200 m

The pack reports through wiring that already reaches your cabinet aggregation point. No new monitoring platform, no site-specific gateway to maintain.

Built-in GPS tracker and cloud platform

An unmanned site is a target. A battery that reports its own location turns a total loss into a recovery, and it is standard rather than an option.

Built-in fire protection module

Short-circuit and over-temperature conditions are watched inside the pack, alongside BMS overcharge and over-discharge protection. One fewer subsystem for you to integrate and inspect.

Built-in DC/DC with adjustable output (Intelligent Series)

Match an existing plant's float voltage instead of replacing the rectifier to suit the battery. This is what makes a retrofit a swap rather than a project.

1U at 10Ah, 5U at 200Ah, all 442 mm wide

Standard 19-inch mounting across the range. You can scale runtime at a site without re-engineering the rack layout.

17.6 lb to 165 lb per module

Two people and a ladder instead of a lift gate and a battery cart. Tower and rooftop sites have weight limits that lead-acid strings argue with.

Published series data, in US units

The numbers you need to fill in a drawing.

Dimensions and weights below are the manufacturer’s published figures. Inches, pounds, and rack units are converted so you are not doing it on a notepad. Ask us for the discharge curves for any part number here.

V-LFP 48V Standard Series — base stations and remote cabinets
ModelNominalRackDimensions (in)Dimensions (mm)WeightMax discharge
V-LFP481048V / 10Ah1U17.4 × 11.2 × 1.7442 × 285 × 4417.6 lb (8 kg)10 A
V-LFP482048V / 20Ah2U17.3 × 9.6 × 3.5440 × 243 × 8821.4 lb (9.7 kg)20 A
V-LFP483048V / 30Ah2U17.4 × 15.2 × 3.5442 × 385 × 8839.7 lb (18 kg)30 A
V-LFP485048V / 50Ah3U17.4 × 17.3 × 5.3442 × 440 × 134.566.1 lb (30 kg)50 A
V-LFP48100 (2U)48V / 100Ah2U17.4 × 20.5 × 3.5442 × 520 × 8897 lb (44 kg)100 A
V-LFP4810048V / 100Ah3U17.4 × 18.9 × 5.2442 × 480 × 13388.2 lb (40 kg)100 A
V-LFP4820048V / 200Ah5U17.4 × 21.7 × 8.7442 × 550 × 222165.3 lb (75 kg)100 A

The published Standard Series table also lists a 150Ah entry under a repeated part number. We are confirming the correct designation with the factory rather than printing a guess — a 48V 150Ah Standard unit is in production and is the model deployed on the Uzbekistan base-station upgrade below.

V-LFP 48V Intelligent Series — built-in DC/DC, constant and adjustable voltage output
ModelNominalRackDimensions (in)Dimensions (mm)WeightMax discharge
V-LFP48100S48V / 100Ah3U17.4 × 17.7 × 5.3442 × 450 × 134.588.2 lb (40 kg)100 A
V-LFP48150S48V / 150Ah5U17.4 × 19.7 × 7.6442 × 500 × 192127.9 lb (58 kg)100 A
V-LFP48200S48V / 200Ah5U17.4 × 21.7 × 7.6442 × 550 × 192165.3 lb (75 kg)100 A

Heights of 190–192 mm measure 4.3 rack units. Plan a 5U opening.

The objections, answered

What engineers ask us before they put us on a bid list.

We already have an approved vendor for this.

You do, and that is exactly why this conversation should happen now instead of when you need a second source. Qualification takes months. Availability problems take days. Start the paperwork on a low-risk telecom SKU while there is no pressure on it.

Nobody here has heard of you.

In the US, that is fair. Globally, Vision has been manufacturing batteries since 1994, is listed on the Shenzhen Stock Exchange, and won China Mobile's competitive public tender for base-station batteries. The recognition gap is real. The track record is not the thing that is missing.

Cheap lithium packs are a liability, not a saving.

Agreed. That is why the cell matters more than the pack price. We manufacture our own LFP cells rather than buying them from whoever quoted lowest this quarter, and we will tell you which cell is in the model you are looking at.

Support is going to be a time zone away.

Our US team answers in Joplin, Missouri, Monday to Friday, 8 to 5 Central, and we hold inventory in Lancaster, Texas. When you need a factory engineer, we bring one onto the call rather than emailing your question overseas.

We buy globally, not just for the US.

Then this is the easy part. Vision ships to more than 100 countries with regional entities and manufacturing bases. You can research and specify here and place the purchase order through the entity that serves the installation. Tell us the country and we will tell you who invoices it.

Deployed, documented, and checkable

Carrier-scale is not a claim we are making for you.

These are published Vision projects. If you want the case documents, ask and we will send them rather than summarising them at you.

Telecom power supply project for China Mobile base stations

160,000 batteries

China Mobile

Vision won China Mobile's competitive public tender and has supplied 100,000 CL 2V Series and 60,000 Long-Life FM Series batteries into new and existing base-station power systems. China Mobile reported 1.0 billion mobile customers as of 30 June 2024.

Telecom station power system upgrade project in Uzbekistan

48V 150Ah, in parallel

Uzbekistan 5G upgrade

A national telecom operator converted base stations from lead-acid to lithium using multiple parallel V-LFP 48V 150Ah units, with GPS tracking and cloud management specified against battery theft.

Telecom power supply project in the Kingdom of Eswatini

Remote-site power

Kingdom of Eswatini

A national telecom power supply deployment. Ask us for the project detail — the conditions at these sites are closer to a rural US cell site than a data center is.

“Best battery, best team!”
Mr. Timur K., project manager — base-station power system upgrade, Uzbekistan. Quoted from Vision’s published project record. It is a short quote and we are not going to dress it up as a case study testimonial it is not.

A VRLA string installed in 2021 is at the end of its service life right now. You are going to dispatch a truck to those cabinets this year whether it is on the plan or not — the only open question is what gets installed when the technician is already standing there.

That is the whole argument for looking at this now rather than at renewal. The dispatch is already budgeted. Changing what goes into the cabinet costs one conversation; changing it after the technician leaves costs another truck.

Next step

Send us one site. We will size it and show our work.

Not a brochure request. Give us a real cabinet — rectifier, free rack units, ambient range, required runtime — and you get a part number, the rack units it takes, the weight, and the discharge curve. If lead-acid is the right answer for that site, we will tell you that instead.

  • US inventory in Joplin, Missouri and Lancaster, Texas
  • Cell manufacturer and pack builder are the same company
  • Regional invoicing for installations outside the US

Prefer to call? (417) 625-4842 Monday–Friday, 8:00–5:00 Central.

We reply from Missouri, not from a queue. No newsletter signup attached to this form.

Before you ask us on a call

Questions we get from network engineers.

What cycle life should I design to?

Ask us for the discharge and cycle-life curves for the exact model you are sizing, and we will send them. We would rather give you the test data for one part number than a round marketing number that covers the whole series. Cycle life moves with depth of discharge, C-rate, and cabinet temperature, and a single figure hides all three.

Can these systems parallel across an existing string?

Yes. The V-LFP 48V Standard Series is deployed in parallel-connected groups today — a telecom operator in Uzbekistan upgraded existing base stations that way, using multiple parallel 48V 150Ah units. Tell us your rectifier make, float voltage, and the number of shelves you have free, and we will confirm the configuration before you order.

How do I monitor these without adding a new NMS?

The Standard Series uses RS485 for remote monitoring and control, with data transmission up to 1,200 meters without significant signal loss. That reaches the shelter or cabinet aggregation point at most sites, so the battery reports through infrastructure you already have.

What stops the batteries from being stolen?

The Standard Series includes a built-in GPS tracker tied into a cloud management platform. It was specified for exactly this reason on the Uzbekistan base-station upgrade. Copper and battery theft at unmanned sites is a real operating cost, and a battery that reports its own location changes the math.

Is the fire protection integral or something I add?

The Standard Series pack includes a built-in fire protection module that monitors for short-circuit and overheating conditions, alongside BMS overcharge, over-discharge, and over-temperature protection. Local code still governs the room or cabinet — bring us your AHJ requirements and we will tell you plainly what the pack does and does not satisfy.

Who do I actually talk to, and where does the product ship from?

You talk to our US team in Joplin, Missouri at (417) 625-4842, Monday–Friday, 8:00–5:00 Central. We also operate a warehouse in Lancaster, Texas, inside the Dallas–Fort Worth metro. Ask us to confirm current stock for your part number before you build it into a schedule — we would rather tell you a real lead time than a comfortable one.

You are a Chinese manufacturer. Why should a US carrier qualify you?

Because the alternative is qualifying a US brand that had the cells made overseas anyway, without telling you which factory. We manufacture the cell and build the pack, we are publicly listed on the Shenzhen Stock Exchange, and we hold US inventory and US-based support. Every claim on this page traces to a published document we will hand you. Judge us on the documentation, not the postmark.

Still deciding where this fits? See containerized energy storage or the cell formats we manufacture.